STARTING SUNDAY, JANUARY 17, 2016 UNTIL THE EXPO LINE IS OPEN FOR PASSENGER SERVICE
Metro will be conducting Train Testing and Operator Familiarization of the Expo Line to Santa Monica. Please be aware that trains will be operating on the tracks. These activities are necessary as we lead up to full train service (Spring 2016.)
HOURS OF TRAIN ACTIVITIES WILL VARY
Along Expo Line tracks from National/Palms Station to the Downtown Santa Monica Station (4th St./Colorado)
It is necessary to obey ALL traffic signs and signals at ALL times.
Safety Tips
- Please obey all warning signs and traffic signals when crossing the tracks.
- Always look both ways before crossing any street.
- Â Never walk on railroad tracks.
- Â Watch for trains from both directions.
- Use the crosswalks. Do not jaywalk across the tracks.
Train Testing from now until Expo Line is Open: STARTING SUNDAY, JANUARY 17, 2016 UNTIL THE EXPO LINE IS OPEN FOR… https://t.co/DNB0SH1KbU